Reference

More Resources

 

Section 5352.291-9005: End Items Beyond Economical Repair.

As prescribed in 5391.102(e), insert the following clause in Section I:

END ITEMS BEYOND ECONOMICAL REPAIR (AFMC) (JUL 1997)

(a) "Economically Reparable End Items" are defined as end items which can be restored to a serviceable condition, in accordance with applicable requirements, when costs of repair will not exceed (Insert percentage) of the Stock List Price specified in the contract. If the contractor estimates the total cost of the repair and/or overhaul of any end item received will exceed the above percentage of the Stock List Price, the Contractor shall promptly notify the administrative contracting officer in writing and shall not perform further services on any such items except at the direction of the administrative contracting officer. Upon receipt of the written notification that a particular item is not reparable, the contractor shall dispose of the unit in the manner directed by the administrative contracting officer

(b) The procuring contracting officer may authorize the contractor, through the administrative contracting officer, to exceed the percentage of the Stock List Price in subparagraph (a) above when an item is in critical supply status.

(End of Clause)




Warning: require(/home/simplyauto/www/includes/site_footer.php): failed to open stream: Permission denied in /home/simplyauto/www/regs/fars/section.php on line 347

Fatal error: require(): Failed opening required '../../includes/site_footer.php' (include_path='.:/usr/local/lib/php') in /home/simplyauto/www/regs/fars/section.php on line 347